Federal grant · project grant (b)
Award Purpose the Project Includes the Purchase of Two Tier 4 Diesel Reach Stackers 12 Hybrid Pick Up Trucks 14 Tier 4 Yard Trucks 11 TIER4 Diesel Top Handlers One With Over Height Spreader One Tier 4 Diesel Top Handler With Limited Capacity for Handling Empty Containers One Tier 4 Forklift 12 5 Ton Capacity 25 Liquefied Petroleum Gas LPG Terminal Tractors Reefer Racks Totaling 192 Slots Two Hybrid Rubber Tired Gantry RTG Cranes With Two Spare Spreaders and One Spreader Testing Bench. the Project Also Includes Port and Maritime Modernization Plans Electrical System Upgrades and Associated Civil Works to Support Increased Terminal Power Demand High Mast Lighting, Optical Character Recognition Ocr at the Crowley Terminal Gate Two Concrete RTG Runs One Maintenance Safety Equipment and Wash Station and Two Plug in Stations for the Hybrid RTGS While at Rest at the Port Everglades Terminal Pet. Activities to Be Performed Component 1 Crowley Project Administration Grant Administration and Fees Throughout Project Life Cycle Port and Maritime Modernization Plan Equipment Purchase 2 Reach Stackers TIER4 Diesel 12 Hybrid Pick Up Trucks 14 Tier 4 Yard Trucks 4 Tier 4 Diesel Top Handlers Construction and Civil Work Reefer Rack Construction Construct Reefer Racks Supporting 192 Plugs Total. Electrical Upgrades Electrical System Upgrades Such as New Electric Utility Substation Construction 24 High Mast Lighting 2 Optical Character Recognition Ocr Portals Infrastructure Will Include the Portal Structure Foundation and Connection to Terminal Electric and Data Systems. Component 2 Port Everglades Terminal Project Administration Grant Administration and Fees Throughout Project Life Cycle Port and Maritime Modernization Plan Equipment Purchase 7 Tier 4 Stage 5 Top Handlers One With Over Height Spreader 1 Tier 4 Stage 5 Top Handler With Limited Capacity for Handling Empty Containers 1 TIER4 Diesel Forklift 12 5 Ton CAPACITY2 5 Liquefied Petroleum Gas LPG Terminal TRACTORS2 Deliverables Expected Outcomes From Schedule G Page 12 of the Grant Agreement Measure Cargo Volume. Category and Description Economic Competitiveness and Opportunity Total Tons of Cargo Moved Per Year Teus or Short Tons. Cargo Volume Measures the Movement of Freight Through the Project Study Area. When Applicable, Report the Total Cargo Volume and the Volume Disaggregated by Type of Freight Ie Containers in Teu and Bulk in Tons or Type of Intermodal Transport (truck or Rail. Frequency Quarterly. Measure Reportable Events. Category and Description Safety Quality of Life Total Number of Reportable Events Per Year. a Reportable Event Is Defined as a Safety or Security Event Occurring in the Project Study Area Terminal Berth Etc That Results in One or More of the Following Conditions a Fatality Confirmed Within 30 Days of the Event an Injury Requiring Immediate Medical Attention Away From the Scene for One or More Person Property Damage Equal to or Exceeding 25000 Collisions Involving Vehicles or Vessels an Evacuation for Life Safety Reasons. Frequency Quarterly. Intended Beneficiary Broward County of Subrecipient Activities None. Intended Beneficiary Broward County of Subrecipient Activities None.
Committed
$53.4 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.