Federal grant · project grant (b)
Award Purpose the Project Will Acquire Electric and Hybrid Cargo Handling Equipment at Portmiami, Including a Total of Approximately 47 Terminal Tractors Three Hybrid Rubber Tired Gantry Cranes RTGS 76 Hybrid Trucks 42 Dual Charging Stations and the Infrastructure to Connect and Charge the Equipment for 2 Cargo Terminals. the Project Will Also Replace Approximately 432 Existing Diesel-powered Reefer Generators Creating a New Total of Approximately 820 All Electric Reefer Outlets. Activities to Be Performed the Project Will Be Completed in Three Components With the Following Elements Component 1 Engineering and Design Preliminary Through Final Design for the Reefer Generators. Component 2 Equipment Purchase Group 1 Seaboard. Equipment Purchase Approximately 9 Utility Tractor Rigs Utrs. Approximately Three Hybrid RTGS Approximately 2 Dual Charging Stations. Component 3 Equipment Purchase Group 2 South Florida Container Terminal SFCT. Equipment Purchase Approximately 40 Dual Charging Stations Approximately 38 Utrs Approximately 70 Hybrid Pickup Trucks and 6 Hybrid Sport Utility Vehicles Suvs. Component 4 Supporting Infrastructure Demolition New Elevated Concrete Pads Installation of Infrastructure to Connect and Charge the Equipment Including Feeders Replacement of Approximately 432 Existing Diesel Powered Reefer Generators and Gen Sets With Electric Reefer Plugs and Expansion of the Number of Plugs by Approximately 388 Creating a New Total of Approximately 820 All Electric Reefer Outlets Expansion and Improvements to the Electrical System Deliverables Expected Outcomes From Schedule G Page 10 of the Grant Agreement Measure Cargo Volume Teus. Category and Description Economic Competitiveness and Opportunity Total Tons of Cargo Moved Per Year Teus. the Movement of Freight Through the Project Study Area Report the Total Cargo Volume and the Volume Disaggregated by Type of Freight Ie Containers in Teu . Measurement Frequency Quarterly. Measure Operating and Maintenance Costs. Category and Description State of Good Repair Total Costs by Category Per Year. Report Operating and or Maintenance Costs for Only the Project Study Area. Costs Must Be Disaggregated by Any of the Following Costs of Operating Such as Fuel and Oil Maintenance Costs for Services Parts or Supplies. Measurement Frequency Quarterly. Intended Beneficiary Miami Dade County. Subrecipient Activities None.
Committed
$25.7 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.