Federal grant · project grant (b)
Award Purpose This Planning Project Will Advance Environmental Review Permitting and Preliminary Engineering and Design for the Intermodal Terminal Component of the Larger Pcip Project Including the Railyard Container Yard Wharf and Berths. Activities to Be Performed Component 1 Preliminary Engineering and Design Objectives Geotechnical and Basis of Design 30 Percent Design 60PERCENT Design. Specific Scope Items Will Include Civil Engineering Grading and Yard Design Fire Design Rail Design Modeling, Compressed Air Design Stormwater Design and Report Water Design Sewer Design Lift Station Design Analysis Design Dune Risk Coastal Engineering Dredging Slope Protection Etc. Component 2 Environmental and Permitting Objectives Environmental Studies Nepa Permitting Specific Scope Items Will Include Environmental Nepa Nepa Project Management Air Quality Baseline Emissions Greenhouse Gas GHG Evaluation Ambient Noise in Air and in Water Noise Surficial Soils and Dunes Habitat Characterization and Mapping Terrestrial Wetland Tidal Subtidal Wildlife Surveys Bald Eagle Nests Wading Bird Rookeries Etc Hazardous Toxic and Radioactive Waste Characterization Phase I and Lead Remediation Plan and Sampling Historical Archeological Planetological Tribal Studies Land Use Ownership Recreational Use Socioeconomics Scenic Aesthetic Baseline Including Light Source Analysis Transportation Baseline Worker Vehicle Truck Trains on North Spit. Component 3 Project Administration and Management Contract Management Procurement Funding Administration and Compliance Stakeholder Engagement and Day to Day Project Management to Ensure All Scopes Are Moving Forward in a Timely and Efficient Manner. Deliverables Expected Outcomes From Schedule G Page 11 of the Grant Agreement Measure Jobs Created Within 5 Years of Design Nepa Completion. Category and Description Economic Impact Tracks Direct Indirect and Induced Jobs Generated by the Project Including Construction Jobs Permanent Terminal Operations Jobs, and Induced Jobs in Logistics and Supply Chain Sectors. Measurement Frequency Annual. Measure Terminal Construction Completion Within 5 Years of Design Nepa Completion. Category and Description Project Delivery and Infrastructure Readiness Confirms Substantial Completion of Terminal Construction and Full Operational Readiness Within 5 Years of Design Nepa Completion Ensuring Timely Delivery of Project Benefits. Measurement Frequency Annual. Intended Beneficiary Oregon International Port of Coos Bay. Subrecipient Activities None.
Committed
$27.8 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.