Federal grant · project grant (b)
Award Purpose the Project Will Complete the Pier B Ondock Rail Support Facility Program by Completing the North Rail Yard Expansion and the South Rail Yard Expansion. the North Rail Yard Expansion Will Construct Two New Mainline Tracks Five New Approximately 10000 Foot Receiving and Departure Tracks Extending From West of the Dominguez Channel to the Pico Avenue Rail Corridor and 28 New Storage Tracks North of the Existing Pier B Yard. It Also Includes Active at Grade Warning Devices and Railroad Preemption With a New Traffic Signal at Pier B Street. the South Rail Yard Expansion Will Add Seven New Approximately 3000 Foot Storage Tracks Lengthen and Rehabilitate Seven Existing Approximately 3000 Foot Storage Tracks Construct Two New Tracks in the Pico Avenue Rail Corridor Reconfigure Tracks Near Pier D Street and Construct a New Compressed Air Facility. Activities to Be Performed Element 1 Construction Phase Architectural and Engineering a and E. Engineering During Construction Management Project Management and Construction Support During Bid and Award Construction and Closeout. Element Construction Construct Two New Mainline Tracks Five New Approximately 10000 Foot Receiving and Departure Tracks Extending From West of the Dominguez Channel to the Pico Avenue Rail Corridor 28 New Storage Tracks North of the Existing Pier B Yard Construct the Roadway Knuckle at Harbor Avenue and 11TH Street Reconstructed Existing Pier B Rail Yard by Adding Seven New Approximately 3000 Foot Storage Tracks and Lengthen and Rehabilitate Seven Existing Approximately 3000 Foot Storage Tracks Construct Two New Tracks in the Pico Avenue Rail Corridor Reconfigure Mead Yard Ladder and Lead Track Across Anaheim Way and Add Active at Grade Warning Devices and Railroad Pre Emption With a New Traffic Signal at Pier B Street Reconfigure Tracks Near Pier D Street and Construct a New Compressed Air Facility With Associated Piping Within the Rail Yard. Approximate Total Project Quantities Include 175000 Feet of New Track 150 New Items of Special Track Work and 150REMOTELY Controlled Power Switch Operators. Deliverables Expected Outcomes From Page 10 Schedule G of the Grant Agreement Intended Beneficiary City of Long Beach. Subrecipient Activities None. Measure Freight Movements. Projected Outcome an Increase in the Total Number of Containers Moved by on Dock Rail. Category and Description Economic Competitiveness a Table That Shows the Total Number of Containers and the Total Number of Containers Moved by on Dock Rail in the Study Area. Measurement Frequency Annual. Measure Gross Tons. Projected Outcome an Increase in Cargo Tonnage Moved Through Marine Terminals. Category and Description Economic Competitiveness the Total Number of Gross Short Tons That Moved Through the Study Are. Measurement Frequency Annual.
Committed
$283.4 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.