Federal grant · project grant (b)
The Project Will Reconfigure and Realign the Shoreline Within the North Extension the Area North of the Existing General Cargo Terminals at the Don Young Port of Alaska One of the Nations Commercial Strategic Seaports. the Project Includes the Demolition of a Sheet Pile Wall Removal of Approximately 1 465 Million Cubic Yards of Material and Construction of a Shoreline Revetment of Armor Rock. the Project Is a Part of the Ports Modernization Program a Series of Projects Designed to Ensure the Ports Operational Safety Efficiency and Reliability. Activities to Be Performed the Purpose of the Project Is to Create a Safe and Stable Area That Will Support Port Operations Make the North Extension Land Available for Future Use and Create Safe Vessel Maneuvering Conditions for Docking at the Cargo Terminals. the Project Will Stabilize Reconfigure and Realign the Shoreline North of the Don Young Port of Alaskas General Cargo Terminals and Will Address Structural Stability Seismic Resilience and Navigational Concerns at the Port One of the Nations Commercial Strategic Seaports. the Project Will Also Create a Safe and Cost-effective Path for Replacing Deteriorating Cargo Terminals as Part of the Port of Alaska Modernization Program (pamp). This Project Is Made of Two Components Component 1 Program Management and Permitting: This Component Consists of the Work to Manage the Project From Design Through Construction. It Includes the Work Required to Apply for All Federal Permits and Support the Nepa Process Program Cost and Schedule Reporting Document Management and Risk Management. It Also Includes the Effort Required to Administer and Oversee the Design Build Contractor. Component 2 Design and Construction the Work to Complete the Project Will Be Accomplished Under a Design Build Contract. the Project Will Remove About Half of the Existing North Extension Extending Approximately 900 Feet North From the Southernmost Extent of the North Extension and Stabilize the Shoreline in the Area. Work Consists of Demolition of the Existing Sheet Pile Structure Flat Sheet Facepiles Bulkhead Fill and Tailwalls Removal of Approximately 1.465 Million Cubic Yards of Material Down to Negative 40 Feet Mean Lower Low Water MLLW. Disposal of Approximately 1.35 Million Cubic Yards of Removed Material to an Approved Disposal Location Offshore. Stockpile of Approximately 115000 Cubic Yards of Sand and Gravel in Uplands on Existing Fill for Future Projects. Temporary Stockpile of Up to 48000 Cubic Yards of Contaminated Soil for Remediation and Disposal at the End of the Project. Construction of Shoreline Revetment of Armor Rock the Lower Portion of the Embankment Slope Will Be at 6H 1V 6 Feet Horizontal to 1 Foot Vertical Slope and Unarmored. a Grade Break Will Occur at the End of the Unarmored Slope and the Slope Will Then Transition to a 2H 1V Armored Slope Consisting of Primary Armor Stone Median Sized at 4600 Pounds Filter Rock and Granular Fill. Deliverables Expected Outcomes Performance Measure Table From Schedule G Page 13 of the Grant Agreement Measure Category and Description Measurement Frequency Closure From Natural Hazards State of Good Repair Total Hours of Facility Closure Per Year Quarterly Cargo Volume Economic Competitiveness and Opportunity Total Tons of Cargo Moved Per Year Teus or Short Tons Quarterly Vessel Calls Economic Competitiveness and Opportunity Total Vessel Calls Per Year Quarterly Intended Beneficiary Anchorage Municipality of Inc Subrecipient Activities None.
Committed
$68.7 Million
Paid out
$20.1M
29%
Committed, not yet paid
$48.6M
71%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.