Federal grant · project grant (b)
Award Purpose the Project Will Improve the Wharf to Support Working Two Barges at the Same Time at Richmond Marine Terminal RMT. Activities to Be Performed the Project Will Permit the Safe Operation of Two Cranes Working Simultaneously and Will Allow RMT to Achieve the Projected Barge Growth. the Project Includes Two Components Component 1 Engineering and Design a Site Survey Will Be Performed to Establish a Baseline Wharf Alignment. Ti Back Rod Locations Will Be Approximated Based on the Nut and Washer Assemblies Visible Along the Face of the Wharf. Test Pits Will Be Dug to Confirm Tie Back Orientation and Depth. a Geotechnical Investigation Will Be Performed to Improve the Understanding of the Geotechnical Conditions and Support Design of the Pile Foundations. Preliminary Design Will Establish Operational Loading Conditions. the 60 Percent Design Documents Will Further Develop the Preliminary Design Documents and Include Stormwater Management Plans. the Final Bid Ready Plans and Specifications Will Include All Contractual Elements Necessary to Advertise the Work for Bids. Component 2 Wharf Improvements Install a Pile Supported Relieving Platform and Approach Slab to Increase the Loadbearing Capacity of the 1930S Vintage Concrete Gravity Wall Such That It Can Accommodate Mobile Harbor Crane Loads. Deliverables Expected Outcomes From Page 11 Schedule G From the Grant Agreement Measure Freight Movements. Category and Description Economic Competitiveness Teu Movements Over Project Study Area. Measurement Frequency Quarterly. Measure Highway Mile Savings. Category and Description Environmental Sustainability Savings Calculated Based on the Elimination of Highway Miles That Each Container Would Have Traveled on Surface Roads.. Measurement Frequency Quarterly. Intended Beneficiary Commonwealth of Virginia. Subrecipient Activities None.
Committed
$3.7 Million
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then .