Federal grant · project grant (b)
Sbir Phase I: Ultra-efficient Data Center Power Conversion -the Broader/commercial Impact of This Small Business Technology Transfer (SBIR) Phase I Project Will Center on the Development of Novel Power Converters and Control Schemes for an Ultra-efficient Rack-level Data Center Power Supply System. the Data Center Industry Presents a Large and Growing Load on America?s Power Grid - Approximately 200 Billion KWH in 2022, Roughly 4% of Total Domestic Energy Consumption. This Rapid Growth Is Straining Utilities? Ability to Provide Power to Future Data Centers and Current Customers. as a Result, Demand-side Efficiency Improvements May Have an Outsized Impact. This Project Aims to Develop Extremely Low-loss and High-density Power Conversion Systems Utilizing an Innovative Differential Power Processing System. Broadly, Server Power Supplies Are an Estimated $2.9 Billion Market. Successful Development of the Proposed System Will Reduce Energy Consumption From the Data Center Industry and May Enable the Deployment of Power-hungry and Economically Critical Ai Technologies. the Intellectual Merit of This Project Involves the Development of Converter Topologies and Associated Control Strategies That Enable the Integration of a Differential Power Processing (DPP) Approach Into Existing Data Center Power Distribution. the DPP Approach Has Been Successfully Demonstrated at Low-power in Academia, But Never Deployed in Real-world, Kilowatt-scale Systems. One Important Challenge That This Project Aims to Address Is Interfacing the DPP Architecture With the Main Data Center Buses. This Will Be Achieved via Two Thrusts. the First Will Focus on Legacy Ac Distribution Systems, Aiming to Develop a Highly Efficient Isolated Three-phase Ac Power Factor Correction & Rectification Converter With Current-mode Control. This Is Not Achievable With Commercial Off the Shelf Converters and Necessitates Novel Topological Innovation. the Second Thrust Will Center Around Integrating With Emerging High Voltage DC Distribution Systems and Will Involve Developing Converters With Fault-tolerant Control Schemes Unique to the DPP Architecture. Both Research Directions Will Entail a Combination of Circuit Simulation and Physical Hardware Prototyping. Successful Completion of the Phase I Project Objectives Would Substantially De-risk the DPP Approach in Data Center Environments and Could Enable Full System Integration and High-power Demonstration. This Award Reflects NSF'S Statutory Mission and Has Been Deemed Worthy of Support Through Evaluation Using the Foundation's Intellectual Merit and Broader Impacts Review Criteria.- Subawards Are Planned for This Award.
Committed
$305,000
Paid out
$203.2K
67%
Committed, not yet paid
$101.8K
33%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.