Federal grant · project grant (b)
STTR Phase I: Development of Earth-based, Long-range Wireless Power Transfer for Subsurface Iot Systems -this Small Business Technology Transfer Phase I Project Will Develop Technology to Transmit Wireless Power and Data Through the Subsurface. This Technology Will Enhance Subsurface Characterization, a Critical Capability for Industries Advancing U.s. Electrification, Such as Geothermal Power and Mining. Contemporary Wireless Power and Communication Techniques Perform Poorly Underground, Making It Challenging to Deploy Autonomous Subsurface Devices. Additionally, Changing or Charging Batteries at Depth Remains a Significant Challenge. the Subsurface Characterization Market Is Valued at Approximately $8 Billion Domestically and $14 Billion Globally Per Year, With Projections Reaching $25 Billion Worldwide Within the Next Decade. Beyond the Primary Application, This Wireless Technology Could Transform Multiple Industries, Including Power Transmission. the Technology Could Expand Electricity Access and Enhance U.s. Energy Security by Significantly Reducing Power Infrastructure Costs. the Underground Design Further Enhances Resilience, Protecting Against Damage From Disasters and Wildfires. This Innovation Also Bridges Electrical Engineering and Geophysics, Laying the Foundation for Future Breakthroughs in the Field. the Intellectual Merit of This Project Lies in Its Innovative Approach to Transmitting Wireless Power and Data Through the Ground. the Core Innovation Diverges From Contemporary Long-range Wireless Power Solutions That Rely on Electromagnetic Space-wave Techniques Through the Air. the Primary Research Objectives Are to Develop Numerical Models, Conduct Field Testing, and Perform Environmental and Safety Studies. This Research Will Involve Scaling and Testing the Functional Prototype, Focusing on Improving Transmitter and Receiver Designs. Additionally, the Research Will Focus on Reducing Surface Voltage and Assessing Building and Environmental Safety. the Anticipated Technical Results Include Field Demonstrations That Significantly Scale the System?s Capacity and a Structured Plan for Safe Scaling. This Project Is Expected to Advance the Field of Underground Wireless Power Transfer and Communications, Providing a Robust Solution for Subsurface Characterization and Potential Uses in a Host of Other Applications. This Award Reflects NSF'S Statutory Mission and Has Been Deemed Worthy of Support Through Evaluation Using the Foundation's Intellectual Merit and Broader Impacts Review Criteria.- Subawards Are Planned for This Award.
Committed
$305,000
Paid out
$280.0K
92%
Committed, not yet paid
$25.0K
8%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.