Federal grant · cooperative agreement (b)
Sbir Phase Ii: Affordable Onsite Wastewater Treatment Solution -the Broader/commercial Impact of This Small Business Innovation Research (SBIR) Phase Ii Project Addresses the Poor Performance and Unaffordability of Existing, Onsite, Wastewater Treatment Technologies. in Hawaii, the State Government Has Mandated the Upgrade of 88,000 Cesspools Across the State by 2050, But Studies Have Shown That 97% of Homeowners Will Not Be Able to Afford the Upgrade. Further, an Estimated 55% of Hawaiian Homeowners Will Need to Install a System Other Than a Conventional Septic System Due to Site Sizing, Grading, and Sensitive Receiving Environment Constraints. the Proximity of Hawaiian Homes to the Ocean Makes Them Particularly Susceptible to Rising Sea Levels That Disrupt Soil-based Treatment Technologies Like Septic Systems. This Is a Problem in Many Coastal Communities in America, But Perhaps Most Notably in Miami-dade County, FL Where an Estimated 64% of County Septic Tanks Will Begin to Fail Annually by 2040. Existing Upgrades to Septic Systems Exist But They Take the Form of Septic System Add-ons or Package Plants That Invariably Drive Up the Cost of Treatment Systems. This Sbir Phase Ii Project Is Developing a Wastewater Treatment Technology Similar in Shape and Size to a Solar Hot Water Heater. the System Is Designed to Operate Passively, Similar to a Septic Tank, But Utilizing Photosynthesis Within a Symbiotic Algal-bacterial Biofilm to Provide High Quality Aerobic Treatment on Par With Expensive Package Plants. the Aboveground Typology of the Treatment Unit Protects the Treatment Process From High Groundwater Levels Even During Extreme Flooding Events, Preventing the Spread of Disease and Pollution. Further, Situating the Unit Aboveground Greatly Simplifies the Installation Process to Avoid Expensive Excavation Costs and Unearthing of Homeowner Backyards. This Team Has Successfully Piloted a Proof-of-concept With Phase I Funding. Moving Into Phase Ii, the Team Will Perform Design Iteration on the Key Geometric and Operational Parameters of the Treatment Unit and Subject Prototypes to Sequential Pilot Tests in the Field. the Objective Is to Identify Optimal Manufacturing and Design Criteria for a Resilient Commercial Treatment Product That Meets Industry Standards for Use in Sensitive Receiving Environments. This Award Reflects NSF'S Statutory Mission and Has Been Deemed Worthy of Support Through Evaluation Using the Foundation's Intellectual Merit and Broader Impacts Review Criteria.- Subawards Are Not Planned for This Award.
Committed
$1.2 Million
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.