Federal grant · project grant (b)
Sbir Phase I: Sonic Lift-off (SLO) for Lower Cost Wide Bandgap Devices -the Broader Impact of This Small Business Innovation Research (SBIR) Phase I Project Will Be to Accelerate the Emergence of Next-generation Semiconductors, Beyond Silicon, With Increased Performance and Efficiency Across a Wide Range of Applications, Including Those Essential for the Nation?s Future Energy and Communications Infrastructure. by Replacing the Most Wasteful and Costly Step in the Semiconductor Manufacturing Process, the Proposed Research Will Use Sound (acoustic) Energy to Precisely Cut Semiconductor Materials in a Way That Minimizes Waste and Enables Materials Reuse. This Technology Will Dramatically Decrease Manufacturing Costs and, as a Result, Lead to the Accelerated Development of Faster, Smaller, and More Efficient Devices. This Sbir Phase I Project Will Develop a New Approach to Lower the Cost of Advanced Semiconductor Manufacturing by Using Sound Energy to Lift Off Thin Devices From Their Host Substrates. the Innovative Approach Taken in This Project Uses a Technique to Propagate a Crack Front at a Precise Depth Below the Device Layer of a Wafer With the Application of Acoustic Pulses. This Acoustic Method Wastes No Material and, Most Importantly, Makes It Possible to Reuse the Substrate, Which Is Currently Wasted Using Standard Approaches Such as Mechanical Back Grinding. as the Single Largest Cost in Manufacturing Next-generation Devices Based on Gallium Nitride, the Substrate Material Plays a Key Role in Achieving Higher Performance and Efficiencies Compared to Silicon Devices. Making More Efficient Use of This Material Directly Addresses a Pressing Need to Find Solutions That Drive Down Manufacturing Costs and Accelerates the Adoption of New Semiconductor Innovations Ranging From Power Electronics to Communications Devices and Beyond. This Award Reflects NSF'S Statutory Mission and Has Been Deemed Worthy of Support Through Evaluation Using the Foundation's Intellectual Merit and Broader Impacts Review Criteria.
Committed
$275,000
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.