Federal grant · project grant (b)
Description:this Agreement Provides Funding Under the Inflation Reduction Act (IRA) to Lane County to Tackle the Climate Crisis by Renovating Six Resiliency Hubs Targeting High Risk Populations, Improve Emergency Response Preparedness to Better Handle the Increasing Number of Wildfire Events in the Area, and Improve Indoor Air Quality and Community Health, Primarily by Reducing Exposure to Wildfire Smoke and Other Pollutants.activities:the Activities Included Under This Grant Include Renovating Six Existing Community Facilities to Turn Them Into Resilience Hubs and Engaging Local Communities to Inform the Development of Each Resilience Hub While Building Community Capacity.subrecipient:lane County, as the Lead Applicant, Will Subaward Funds to Collaborating Entities: the City or Special District Owners of Each Hub Facility to Make Improvements Described in the Profiles. Renovations Will Make Each Facility Accessible, Improve Structural Resilience, Update Hvac Systems, Enhance Energy Efficiency, Add Ev Charging (where Applicable) and Fund Solar Panels or a Solar Plus Storage Feasibility Assessment. Lane County Will Contract With Each Hub Owner, and Require the Space Be Quickly Available and Prioritized for Daytime and Overnight Sheltering Including From Hazardous Air, Extreme Temperature and During a Disaster. These Local Hubs Allow Residents to Shelter Closer to Their Homes, Reducing the Need for Travel, Which Reduces Climate Impacts and Accommodates Isolated Communities Due to Road Failure.outcomes:the Anticipated Deliverables Include 102,400 Square Feet of Space Built or Converted Into Six Resilience Hubs Over the Course of the Three-year Grant Period; Eight Trainings at Each Resilience Hub; Two County-wide Exercises Yearly for Public Health Medical Reserve Corps Volunteers to Be Trained and Ready to Support Resilience Hubs; and Distribution of Emergency Supplies and Educational Materials. the Anticipated Outcomes Include Enhanced Physical Safety During Natural Disasters, Improved Relationships Between Communities, Government, Emergency Management, and Other Community-based Partners, and Increased Capacity to Respond to Disasters and Emergencies. the Intended Beneficiaries Include Disadvantaged Communities.
Committed
$19.6 Million
Paid out
$105.7K
<1%
Committed, not yet paid
$19.4M
99%
Loading…
Everything here is this single award's whole record — signed, amended, paid — not a fiscal-year slice. The by-year charts elsewhere split an award across the years it was committed; this page keeps it whole.
Committed is what the government has legally promised on this award so far. Contracts can also carry a ceiling — the maximum if every option is exercised. Unspent ceiling is headroom, not money owed.
The cash actually disbursed against this award. The gap from committed is the disbursement pipeline: promised, not yet cashed.
Each transaction is a signing event — an action that created or changed the award, dated the day it was signed — not a payment. Negative amounts are real: money de-committed at closeout or renegotiation.
One bar, the award’s whole arithmetic: paid out, then committed, not yet paid, then unspent ceiling.