66 filings from 1 registrant · 2008–2026 · latest filed May 20, 2026
Reported on its behalf
$1.8M
every LD-2 on file
Its own filed spend
$0
lobbying for itself
Fees to outside firms
$1.8M
across every firm on file
Spend over time
Every filing period on record, as reported. One column per filed period — a period with no column is a period with no filing, not a zero.
Basis · Amendments and terminations supersede the original report for the same registrant, client and period, so a revised quarter is counted once at its latest filed value. Registration-only filings carry no activity money and are excluded from these totals.
Who lobbies for them
Every outside firm that has filed on this client's behalf, by fees reported.
Reading this · LD-2 reports a hired firm's fee and a registrant's reported expenses on separate lines and never both on one filing, so the two lists above are different quantities and are ranked separately rather than against each other. Firm names link to their own record as the firms chapter lands.
What they lobby on
Issue areas declared on the filings, ranked by how many filings name each one.
Budget/Appropriations
BUD
64 filings
$1.8M on those filings
Waste (hazardous/solid/interstate/nuclear)
WAS
44 filings
$1.4M on those filings
Energy/Nuclear
Bills named in the filings
The 15 most-cited of 99 bill references, extracted from the activity descriptions.
S. 1111118th CongressADVANCE Act of 20238 filingsthrough 2024
S. 404118th CongressNuclear Waste Informed Consent Act8 filingsthrough 2024
This record groups every filed spelling of the client's name into one entity, so "MERCK & CO., INC." and "MERCK & CO INC" read as the same company. The grouping is the client's normalized name — organizations that file under genuinely different names appear separately. Handle: decommissioning-plant-coalition.
ENG
41 filings
$1.1M on those filings
Note · A filing names one to several issue areas and reports a single dollar figure for the period, so the same money appears beside every issue that filing declares. The dollar column is therefore spend on filings that named this issue — it is not a split of the total, and these figures sum above it. Filing counts do not double-count.
117th Congress
Nuclear Waste Informed Consent Act
8 filingsthrough 2022
H.R. 2097117th CongressSTORE Nuclear Fuel Act of 20218 filingsthrough 2022
S. 541117th CongressNuclear Waste Informed Consent Act8 filingsthrough 2022
H.R. 474115th CongressInterim Consolidated Storage Act of 20178 filingsthrough 2018
H.R. 3731117th CongressSTRANDED Act of 20217 filingsthrough 2022
S. 1290117th CongressSTRANDED Act of 20217 filingsthrough 2022
How these are found · Bill references are extracted from the free-text activity description each filing writes, then matched to the Congress in session that filing year. A reference we can't match to a bill on file is still shown, unlinked — we cite what the filing said rather than guess at what it meant. Naming a bill is not a position on it: LD-2 records that a client lobbied on the bill, never which side.